Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications

Product Details
After-sales Service: All Series
Warranty: 1 Year
Max Diameter of Workpiece: Na
Secured Trading Service
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Years of Export Experience
The export experience of the supplier is more than 10 years
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (16)
  • Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
  • Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
  • Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Find Similar Products

Basic Info.

Model NO.
test system
Mass Scope of Workpiece
>20000kg
Type
Power Transformer Test System
Maxcapacity
Na
Accuracy Grade
1
Load Way
Na
Loading Method
Na
Display
PC Software Display
Control
Computer Control
Weight
Depends on The Specific Situation.
Power Source
AC380V
Oil Cylinder Position
Na
Test Object
Power Transformers / Distribution Transformers / S
Data Acquisition
Multi-Channel High-Speed Data Acquisition
Safety Protection
Grid-Isolated Operation / Interlock Protection / E
Phase Control
Output Phase Sequence Configurable (Optional)
Standards
IEC 60076 / IEC 61439 / IEC 60947
Transport Package
Containerized Packing / Export Wooden Packing
Origin
China

Packaging & Delivery

Package Size
800.00cm * 800.00cm * 300.00cm

Product Description

Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
                                                                                            PTTS - POWER TRANSFORMER TEST SYSTEM         
The transformer production line test system is a high-end integrated testing platform integrating automated logistics, intelligent control, data management and standards compliance. Following the assembly-line operation concept, it divides the transformer testing process into multiple specialized test stations. Via automated switching devices and digital management control, it achieves unmanned or minimally manned testing, significantly improving testing efficiency, data accuracy and operational safety.
PTTS
Test Item
Standard
Transformer No-Load/Load Test
IEC60076-1
Transformer Induced Voltage Test
IEC60076-3/EC60270
Transformer Temperature Rising Test
lEC60076-2
Applied Voltage Test
IEC60076-3
Impulse Voltage Test
IEC60076-4
Transformer Class
66kV
110kV
220kV
500kV
Power Source
500kVA
1000kVA
1500kVA
1800kVA
Step-up transformer
1000kVA
2000kVA
3000kVA
4000kVA
Capacitor Bank
10MVar
40MVar
100MVar
180MVar
Impulse Voltage Generator
600kV
800kV
1600kV
2400kV
60kJ
80kJ
160kJ
240kJ
AC Test Transformer
200kV
300kV
300kV
300kV
1A
1A
1A
1.5A
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
             Routine Tests:
               Measurement of D.C. winding resistance.
               Measurement of voltage ratio.
               Check of voltage vector relationship.
               Measurement of No-load loss & current harmonics analysis of No-load current.
               Measurement of load loss & short-circuit impedance.
               Calculation of total loss, impedance, regulation & efficiency.
               Tap changer operation.
               Measurement of insulation resistance.
               AC voltage withstand test.
               Induced AC voltage test with partial discharge.
               Measurement of dissipation power factor (tan o) and capacitance.
               Bushing current transformer test (BCT).
             Type Tests:
             Special Tests:
               Temperature rise test.
               Lightening & switching impulse test.
               Sound level test.
               Sweep frequency response analysis.
               Partial discharge tests.
               Dissolved Gas Analysis (DGA).
               Key Features:
               Integrated platform for routine & type tests of power transformers
               Modular configuration, easy to expand and customize
               Automatic switching & sequencing to streamline workflow
               PLC-based centralized control with data recording & report output
               High accuracy measurement and stable test performance
               Multi-level safety interlocks for safe high-voltage operation
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
System Setup & Application

Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Shanghai Lanqi Electric Co., Ltd.

Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Shanghai Lanqi Electric Co., Ltd.
Launch Electric began with a bold vision: to transform China's high-voltage industry through innovation and engineering excellence. Starting with global imports and local assembly, we've grown into a trusted solutions partner for the power sector. Our journey is defined by precision, reliability, and a deep commitment to quality—delivering systems that meet the evolving demands of modern energy infrastructure.
Over the years, we've expanded our capabilities, introduced cutting-edge testing technologies, and built lasting relationships based on trust, performance, and technical expertise. Today, Launch Electric continues to lead the way—pushing boundaries, setting benchmarks, and powering progress across every project we deliver.
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Our Mission
Our Vision
To drive progress in high-voltage testing through innovation, safeguard energy security with precision and reliability, and empower the sustainable development of global energy infrastructure.
To lead the revolution in high-voltage testing with innovative technologies, safeguarding global energy security and a sustainable future.
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Power Transformer Comprehensive Test System for Factory and High-Voltage Testing Applications
Skilled GIS Professionals
Outfitted with Complete Tools
Comprehensive Installation
Our OEM-trained technicians deliver precise diagnostics, swift repairs, and dependable GIS system recovery.
Equipped with precision tools like SF6 handling kits, vacuum pumps, detectors, and safety-certified PPE, our teams guarantee secure and accurate servicing.
Trained professionals handle all aspects of GIS/AIS services including erection, dismantling, testing, commissioning, shutdowns, and retrofitswith efficiency and expertise.
FAQ
1. How is our product?    
   We are manufacturer, so preferential price and high quality can guarantee. 

2. How soon to get price?
     Usually provide within 6 hours once receiving inquiry. If you are very urgent, please call us then we will       do in priority. 

3. Whal is your terms of delivery?
     EXW,FOB, CFR, CIF, ect. Pls select your most conveient and cost effective. 

4. When there is difficulty in using ? 
     We will first provide equipment operation manual, operation video, or provide training through remote         video call. Ifnecessary, engineers will serve on door. 

5. What about the leading time for production? 
    That depends on order qty and product item. For normal items, usually within 3 working days. Delivery      time is determined by the logistics , generally is 5-7 days. 

6.How to send? 
    For most of our customers, we provide door-to-door service. You only to through import customs                clearance proceduresand pay the import tariff. 

7. How is packing and will the goods be damaged? 
     We will pack standard export packing for everyequipment, so far there is no damage yet, pls no worry.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now